overhead power lines with a nominal voltage above 1 kV a.c. (1.5 kV d.c.);
equipment for measuring electrical energy and equipment for managing electrical loads;
power transformers;
high voltage switchgear and control devices;
energy electronics;
conductive insulators for use in electrical appliances, transformers and installations;
electronic, electromagnetic and capacitive equipment intended for voltage and current adjustment for power tools and protective devices;
electrical installations and protection against electric shock;
systems and components for photovoltaic conversion of solar energy into electricity;
wind turbine systems;
electrical relays;
HV power installations exceeding 1 kV a.c. (1.5 kV d.c.);
qualification of electrical contractors performing electrical installations;
specifications for all types of fuses;
isolators for HV systems;
specification of surge arresters and other impact protection devices;
specifications for measuring transformers;
tensile methods for the degree of protection secured by the housing;
standardized procedures for calculation of short-circuit currents and their thermal and mechanical effects;
lightning protection;
measuring relays and protective equipment;
electromagnetic compatibility;
electrical insulation systems;
general rules for system engineering and construction of electrical installations with a nominal voltage above 1 kV a.c. and 1.5 kV d.c.
Facts and figures
242
New projects
1148
Publications
0
Meetings
0
Members
Relation to mirrors committee
An ISRSM TC may have one or more international (ISO, IEC) or European (CEN, CENELEC) mirror committees in its scope of work. When ISRSM TC monitors the work of international (ISO, IEC) mirror TCs, the manner of participation in the development of the international project (standard) depends on the status of the relevant ISRSM TC in the relevant international body (international TC) in which the project is developed [Membership with active participation (Participating P – member) or as an Observer (O – member)]. When the respective ISRSM TC participates in the development of the international project as a "P - member", then it has an obligation and must actively monitor the development of the international project through a determined and consensus based national position in all stages of voting. In addition, the list of mirror committees is given for this ISRSM TC.