Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Safety rules for the construction and installation of lifts - Existing lifts - Part 83: Rules for the improvement of the resistance against vandalism
40.60 Close of voting
Gas-fired central heating boilers - Part 3-1: H2NG and ACCF - Expansion of EN 15502-2-1:2022
30.99 CD approved for registration as DIS
Health informatics - Classification of purposes for processing personal health information (ISO/DTS 14265:2023)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Geographic information — Classification systems — Part 3: Land Use Meta Language (LUML)
30.99 CD approved for registration as DIS
Health informatics — Requirements for a record of a dispense of a medicinal product
10.99 New project approved
Health informatics - Identification of medicinal products (IDMP) - Implementation guidelines for ISO 11238 for data elements and structures for the unique identification and exchange of regulated information on substances
10.99 New project approved
Requirements for accessing digital medicinal products information by using the existing data carrier
10.99 New project approved
Health informatics - Clinical particulars - Core principles for the harmonization of therapeutic indications terms and identifiers (ISO/DTS 5499:2023)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Health Informatics -- Logical Model for the Identification of Medicinal Products for ISO 11615
10.99 New project approved
Plastics piping systems for drainage, sewerage and water supply, pressure and non-pressure - Glass-reinforced thermosetting plastics (GRP) based on unsaturated polyester resin (UP) - Guidance for the assessment of conformity
60.55 Ratification completed (DOR)
Plastic piping systems - Structural design of buried thermoplastics piping systems - Procedure and guidance under various conditions of loading
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Cycles - Electrically power assisted cycles - Anti-tampering measures
60.55 Ratification completed (DOR)
Methodology for methane emissions quantification for gas transmission, distribution and storage systems and LNG terminals
60.55 Ratification completed (DOR)
Lighting Applications - Adaptive Emergency Escape Lighting Systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Human Resource Management — Diversity and Inclusion Metrics Technical Specification
20.00 New project registered in TC/SC work programme
Human resource management — Learning and development metrics
60.00 Standard under publication
Industrial automation systems and integration — Product data representation and exchange — Part 1647: Application module: Assembly physical interface requirement
60.00 Standard under publication
Geosynthetics — Procedure for simulating damage under interlocking-concrete-block pavement by the roller compactor method
60.00 Standard under publication