Standardization Institute of the Republic of North Macedonia
Phone: +389 02 3247 150, +389 02 3247 159, +389 75 444 627,+389 76 448 791
E-mail: isrsm@isrsm.gov.mk
Yuri Gagarin 15, 3-rd floor, 1000 Skopje
Main menu

Projects and Standards (Work programme)

Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.

Operation, servicing, maintenance, repair and decommissioning of refrigeration, air conditioning and heat pump equipment containing flammable refrigerants, complementing existing standards

60.60 Standard published

ИСРСМ ТК 8 more

Fire resistance tests for service installations - Part 1: Ventilation ducts

90.92 Standard to be revised

ИСРСМ ТК 46 more

Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 2: Safety

40.60 Close of voting

ИСРСМ ТК 27 more

Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 3: Requirements, test conditions and test methods

45.99 Dispatch of FV draft to CCMC

ИСРСМ ТК 27 more

Gas-fired sorption appliances for heating and/or cooling with a net heat input not exceeding 70 kW - Part 6: Calculation of seasonal performances

45.99 Dispatch of FV draft to CCMC

ИСРСМ ТК 27 more

Fire resistance tests for service installations - Part 1: Ventilation ducts

50.60 Close of voting. Proof returned by secretariat

ИСРСМ ТК 46 more

Fire resistance tests for service installations - Part 10: Smoke control dampers

50.60 Close of voting. Proof returned by secretariat

ИСРСМ ТК 46 more

Fire resistance tests for service installations - Part 10: Smoke control dampers

40.60 Close of voting

ИСРСМ ТК 46 more

prEN 1366-15 ‘Fire resistance tests for service installations - Part 15: 1-, 2-, 3- sided ducts’

40.20 DIS ballot initiated: 12 weeks

ИСРСМ ТК 46 more

Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts

40.60 Close of voting

ИСРСМ ТК 46 more

Air conditioners, liquid chilling packages and heat pumps, with electrically driven compressors, for space heating and cooling, commercial and process cooling - Testing and rating at part load conditions and calculation of seasonal performance

40.20 DIS ballot initiated: 12 weeks

ИСРСМ ТК 8 more

Ventilation for buildings - Ductwork - Cleanliness of ventilation systems

40.10 harmonizedStageCodeLabel.40.10

ИСРСМ ТК 8 more

Extended application of results from fire resistance tests for service installations - Part 1: Ducts

50.60 Close of voting. Proof returned by secretariat

ИСРСМ ТК 46 more

Ventilation for buildings - Measurement of air flow rates on site - Methods

40.60 Close of voting

ИСРСМ ТК 8 more

Energy performance of buildings - Ventilation for buildings - Part 3: For non-residential buildings - Performance requirements for ventilation and room-conditioning systems (Modules M5-1, M5-4)

40.60 Close of voting

ИСРСМ ТК 8 more

Ventilation for buildings - Air terminal devices - Aerodynamic testing of damper and valves

45.99 Dispatch of FV draft to CCMC

ИСРСМ ТК 8 more

Heating systems and water based cooling systems in buildings - Energy efficiency classes for technical insulation systems - Calculation method and applications

45.99 Dispatch of FV draft to CCMC

ИСРСМ ТК 8 more

Ventilation for buildings - Air handling units - Mechanical performance

30.99 CD approved for registration as DIS

ИСРСМ ТК 8 more